Sep 25, 2011

installation of stone and glass

last week, we completed the installation of the stone and glass for fire station 21.  there has been some nice coverage in the phinneywood blog and lots of interaction with the community as the work takes shape.  swinging the stone and glass into place on a prominent corner of this main thoroughfare has been challenging, but seattle solstice did a magnificent job, supported by the project engineer, paul diedrich.  i am continually amazed by the spirit of the phinney/greenwood community and the steady stream of folks passing by to offer comments, questions, and "thumbs up". 

here are some pictures from the install.  if we are able to stay on schedule, the lighting will be in place on tuesday of next week (27 SEP).

glass section 01 gets lowered into place.
pick points were drilled into the stone for lowering over the center spline.

jason sets stone #02
stone #03 is set and grouted.
stone #05 stacks on glass section #02.

at the end of day #2.
glass #04 is lowered into place by stuart.
the last and final stone #10


final glass.
nothing broken.  noone hurt.  YAY!!!
the finished work, waiting for lighting.
jason, perri, and stuart. photos by patti.



with the project engineer, paul diedrich